National Stock Number: 8340-01-568-9432 (Tan) | National Stock Number: 8340-01-570-9235 (Green) |
Part Number: CAMSS-HIT-20QMT (Tan) | Part Number: CAMSS-HIT-20QMG (Green) |
General Info |
- Measures 20’ wide x 32’6″ long x 10’ tall
- Usable area of 650 square feet
- 1150 lbs unpackaged
- Assembles in 30 minutes with trained four-person crew
- Used for billeting, command posts, and forward operating bases
|
Cover / Ends |
- 15 oz/sq yd Mil-Spec 44103D fabric
- Vestibule connectors over entries can be used to connect to other shelters or vestibules
- Includes two (2) sets of two (2) 18” ECU ports with a cable port
- Total of fourteen (14) mesh windows with wind resistant blackout covers
- Twelve (12) guy ropes for high wind
- Can connect multiple shelters end to end with integrated connector flap
- Built-in infrared (IR) blocking
- Fabric includes UV inhibitors and is mold and rot resistant.
- Fire resistant fabric that meets NFPA 701
- Cover and ends are radio frequency welded
- Each end panel includes mesh attic vent with cover
|
Personnel Entries |
- Centered on ends of the shelter
- One (1) aluminum personnel door
- 30” wide x 80” high
- Locking flush mount handle
- Secured to the shelter without penetration of the fabric
- One (1) double zipper entry
- 36” wide x 84” high
- Tie offs to hold door open
|
Frame |
- Made from lightweight, high-strength aluminum
- Arches are made with 2”x 2” aluminum square tube
- Continuous base frame to provide vector proofing
- Frame components are interchangeable and color coded to speed assembly
- Pre-drilled base frame for easy anchoring
- Base frame includes connection points to secure cover to frame
- Frame is corrosion resistant aluminum
|
Fabric Floor |
- 15 oz/sq yd non-slip Mil-Spec 44103D
- Floor system is secured to the base frame
- Removable for cleaning and replacement without disassembly of shelter
- Continuous hook and loop perimeter for vector proofing to keep bugs and critters out
|
Liner |
- Shelter includes an internal liner system that helps to maintain internal working conditions of 40° – 80° F in ambient temperatures of -25° to 125° F when supported by a 5-Ton military environmental control unit
- Air sock runs the length of the shelter and has spot cooling
- 8 oz/sq yd Mil-Spec fabric
- Liner is flame resistance per test method ASTM D6413
- After flame – 2 seconds max
- Char length – 6” max
|
Electrical |
- Single phase electrical panel
- Two (2) GFCI 20A breakers
- Two (2) 20A breakers
- One (1) light switch with breaker
- Four (4) twist lock cable connectors
- Two (2) outlet lines with a total of twenty-four (24) quick connect 110V outlets
- Ten (10) quick connect incandescent lights with protective cages
- 50 ft. 20A power cable included
|
Anchoring |
- Thirty-six (36) double headed 18” base frame spikes
- Twelve (12) guy ropes and guy spikes
|
Spares / Repair |
- 30 day spares/repair
- Patch materials for cover, liner, and floor which are all air transportable without special hazmat requirement
|
Tools & Equipment |
- Verified manual
- Sledge hammer
- Spike puller
- Four (4) pull over ropes
|
Life Expectancy / Warranty |
- Shelter has a usable life of 10 years and a 20 year storage life
- Shelter includes a standard manufacturer’s warranty
|
Packaging |
- Wood crate
- Forklift ready and Export approved
- 43” W x 101” L x 30” H
- 310 lbs (empty crate)
- 1460 lbs (total weight with shelter)
- Six fit on a 463L pallet
|
Testing & Engineering |
- Designed to maintain internal temperatures of 40°F to 80°F in ambient temperature of -25°F to 125°F when supported by a 5-ton military environmental control unit
- Meets Test Operations Procedure (TOP) 10-2-175 Tents and Shelters wind load test of similar type and size shelter (NATC Testing)
- Engineering calculation demonstrate shelter performance will meet a 100 mph wind load per ASCE 7-16
- Meets Test Operations Procedure (TOP) 10-2-175 Tents and Shelters 20 psf snow load test (CAMSS Testing)
- Engineering calculations demonstrate shelter performance will meet a 20 psf ground snow load per ASCE 7-16
- Meets Test Operations Procedure (TOP) 10-2-175 Tents and Shelters blowing rain test (NATC Testing)
- Meets Test Operations Procedure (TOP) 10-2-175 Tents and Shelters blackout test at a minimum distance of 100 meters with the naked eye (U.S. Army Aberdeen Test Center)
- Meets Test Operations Procedure (TOP) 10-2-175 Tents and Shelters blackout test at a minimum distance of 300 meters with night vision goggles (U.S. Army Aberdeen Test Center)
- Meets 20 Set-up/Strikes cycles of durability testing per U.S. government test (U.S. Army Aberdeen Test Center)
|
| *Design loads assume that actual soil conditions will meet one of the following in accordance with ASTM D-2487/2488:
- Sand gravel / very dense sand
- Hardpan / Asphalt
*Fabric weights are nominal
*Dimensions are nominal
|