Contact Us

The #1 Provider of Military Structures to the U.S. Government — Built for Strength, Since 1986.

shelters@camss.com

1-800-984-7678

CAMSS Logo
  • Home
  • Popular NSN Shelters
    • Air Force Medium Shelter System
      (CALIFORNIA MEDIUM SHELTER)
    • Air Force Small Shelter System
      (CAMSS 20Q Small Shelter)
    • CAMSS 20QE 2nd Generation Small Shelter
    • Military Medical Shelter
      (CAMSS 20EX)
    • Army CAMSS30 Command Post
      (CAMSS 30CP)
  • Military Products
    • Series
      • Q Series – Base Camps and Medium Maintenance
      • TAC Series – Rapid Deployment Shelters
      • EX Series – Base Camps, Medical and DFAC
      • EX+ Series – Large Area Maintenance Shelters (LAMS)
    • Applications
      • Rapid Deployment
      • Billeting
      • TOC / Command
      • More
    • Packages
      • Camps / Command Posts
      • DFAC / Kitchen
      • Lavatory
      • Medical
    • Product Videos
      • TAC Series Videos
      • Q Series Videos
      • Ex Series Videos
      • EX+ Series Videos
  • Commercial Products
    • Applications
      • Correctional Facilities
      • Construction and Mining Camps
      • Weather Protection
      • Industrial
      • Architectural
    • Shelters
      • 12EX20-CT
      • 14EX20-CT
      • 18Q32-CT
      • 21Q42-CT
      • 24Q48-CT
      • 24EX40-CT
      • 26Q39-CT
  • Support Equipment
    • Containers & Packaging
    • Hubs, Connectors & End caps
    • ECUs & Air Cleansers
    • Flooring
    • Power Distribution
    • Vestibules, Corridors & Partitions
    • Generators
    • Lights
    • Learn More
  • About Us
  • Ordering
Home ▶ Camps / Command Posts ▶ CAMSS 30CP ▶ Customize the CAMSS 30CP
Email
Share
Share on Facebook
Facebook
Tweet about this on Twitter
Twitter
Share on LinkedIn
Linkedin

Customize the CAMSS 30CP

  • CAMSS: Green CAMSS 30CP Military Shelter

  • CAMSS: Green CAMSS 30CP Military Shelter
Request Quote › Customized Specifications›
Request Quote › Customized Specifications ›

Exterior

Color

CAMSS
  • Military Products
  • Commercial Products
  • Support Equipment
  • About Us
  • Ordering
  • Extreme Testing
  • Past Performance
  • All Products
  • Product Videos
  • Privacy Policy

Contact Us
shelters@camss.com
1.800.984.7678

© 2018 CAMSS Shelters

All Rights Reserved.

  • My Account
  • Search
  • 0
Choose to save as PDF in the next window

Custom Specifications

×

Email These Product Specifications

We'll send these specifications along with your message.

  • Email multiple recipients by separating email addresses with a comma.
  • Info for the CAMSS 30CP

    View this shelter online
    • Connect a variety of other shelters to this command post
    • 29'6" Width x 32'6" Length
    The CAMSS 30CP is ideal as a command post for your operations. Several other shelters can be connected to the CAMSS 30CP by its many boot connectors. The 30CP is a variant of  California Medium Shelter System (CAMSS30) which is the Official Medium Shelter System of the United States Air Force, and is widely depended on to support troops around the world. Because of the CAMSS30's extensive testing and real world usage you can be sure that the CAMSS 30CP will be able to handle any environment or situation.
    General Info
    • Measures 29’6” wide x 32’6″ long x 14’9” tall
    • Usable area of 958 square feet
    • 3180 lbs unpackaged
    • Assembles in under 2 hours with a trained six-person crew
    • Used for command posts, TOC, and forward operating bases
    Cover / Ends
    • 15 oz/sq yd Mil-Spec 44103D fabric 
    • Includes two (2) sets of two (2) 18” ECU ports with a cable port
    • Eight (8) mesh windows with wind resistant blackout covers
    • Guy ropes for high winds
    • Can connect multiple shelters using connector boots or end to end with integrated connector flap
    • Built-in infrared (IR) blocking
    • Fabric includes UV inhibitors and is mold and rot resistant.
    • Fire resistant fabric meets NFPA 701
    • Cover and ends are radio frequency welded
    • Each end panel includes mesh attic vent with cover
    • Top liner included
    Personnel Entries
    • Eight (8) double zipper entries (36” W x 84” H)
      • Tie offs to hold door open
      • Boot Connectors to attach other shelters or vestibules
    Frame
    • Made from lightweight, high-strength aluminum
    • Frame components are interchangeable and color coded to speed assembly
    • Base frame pre-drilled for easy anchoring
    • Base frame includes connection points to secure cover to frame
    • Base Frame is powder coated and corrosion resistant
    • End base includes patented pulley tensioning system to tighten cover
    Fabric Floor
    • Includes a Mil-Spec 44103D floor system that is secured to base frame
    • Continuous hook and loop perimeter for vector proofing
    Liner
    • Shelter includes an internal liner system that helps to maintain internal working conditions of 60° – 80° F in ambient temperatures of -55° to 125° F when supported by four military 5-Ton environmental control units (Provide U.S. government lab test with quote demonstrating similar shelter performance maintaining 40° to 80°F with ambient temperatures of -55° to 125°F)
    • Four (4) air socks with spot cooling
    • 8 oz/sq yd Mil-Spec liner fabric
    • Liner is flame resistant per test method ASTM D6413
      • After flame – 2 seconds max
      • Char length – 6” max
    Electrical
    • Single phase electrical panel
      • Two (2) GFCI 20A breakers
      • Two (2) 20A breakers
      • One (1) light switch with breaker
      • Four (4) twist lock cable connectors
    • Two (2) outlet lines with a total of  twenty-four (24) quick connect 110V outlets
    • Ten (10) quick connect LED lights with protective cages
    • 20 ft. 20A power cable included
    Anchoring
    • Thirty-two (32) Double headed 18” base frame spikes
    • Twelve (12) Guy ropes and guy spikes
    • Thirty-two (32) Concrete anchors
    • Eight (8) earth anchors with quick link
    Spares / Repairs
    • 30 day spares/repair
    • Patch materials for cover, liner, and floor which are all air transportable without special hazmat requirement
    Tools & Equipment
    • Verified manual
    • Sledge hammer
    • Spike puller
    • Six (6) pull over ropes
    • Folding extension ladder
    • Hook tool
    • 3/4” box end wrench
    • Cover carry panel
    Life Expectancy / Warranty
    • Shelter has a usable life of 10 years and a 20 year storage life
    • Parts may be ordered through GSA or DLA under cage code: 1M7W1
    • Parts have been assigned National Stock Numbers to simplify ordering
    • Shelter includes a standard manufacturer’s warranty
    Packaging
    • Wood crate
    • Forklift ready and export approved
    • 88” W x 100” L x 58” H
    • 1170 lbs (crate only)
    • 4350 lbs (total weight with shelter)
    Testing & Engineering
    • Tested from -50° to 125° F to maintain inside temperatures of 40° to 80° F with standard military 5-ton ECUs. High heat test conducted with full simulated Saudi Arabia solar load. (Source Selection Testing – McKinley Climatic Laboratories)
    • Wind load capability testing (Source Selection Testing – Aberdeen Proving Ground)
    • Snow load capability of 20 psf (Source Selection Review)
    • Meets naked eye blackout test (Source Selection Testing)
    • 20 setup/strikes and still mission capable (AFOTEC Testing)
    • Assembles in under two hours with trained crew of six (AFOTEC Testing)
    • Tested and passed rain test 40 mph wind with rate of 5 inches per hour (Source Selection Testing – Aberdeen Proving Ground)
    • Tested to accommodate entry/exit of P-19 fire vehicle (AFOTEC Testing)
    • Tested to assemble in MOPP-2 and cold weather gear (AFOTEC Testing)

    *Design loads assume that actual soil conditions will meet one of the following in accordance with ASTM D-2487/2488:

    1. Sand gravel / very dense sand
    2. Hardpan / Asphalt

    *Fabric weights are nominal

    *Dimensions are nominal

CAMSS 30CP

General Info
  • Measures 29’6” wide x 32’6″ long x 14’9” tall
  • Usable area of 958 square feet
  • 3180 lbs unpackaged
  • Assembles in under 2 hours with a trained six-person crew
  • Used for command posts, TOC, and forward operating bases
Cover / Ends
  • 15 oz/sq yd Mil-Spec 44103D fabric 
  • Includes two (2) sets of two (2) 18” ECU ports with a cable port
  • Eight (8) mesh windows with wind resistant blackout covers
  • Guy ropes for high winds
  • Can connect multiple shelters using connector boots or end to end with integrated connector flap
  • Built-in infrared (IR) blocking
  • Fabric includes UV inhibitors and is mold and rot resistant.
  • Fire resistant fabric meets NFPA 701
  • Cover and ends are radio frequency welded
  • Each end panel includes mesh attic vent with cover
  • Top liner included
Personnel Entries
  • Eight (8) double zipper entries (36” W x 84” H)
    • Tie offs to hold door open
    • Boot Connectors to attach other shelters or vestibules
Frame
  • Made from lightweight, high-strength aluminum
  • Frame components are interchangeable and color coded to speed assembly
  • Base frame pre-drilled for easy anchoring
  • Base frame includes connection points to secure cover to frame
  • Base Frame is powder coated and corrosion resistant
  • End base includes patented pulley tensioning system to tighten cover
Fabric Floor
  • Includes a Mil-Spec 44103D floor system that is secured to base frame
  • Continuous hook and loop perimeter for vector proofing
Liner
  • Shelter includes an internal liner system that helps to maintain internal working conditions of 60° – 80° F in ambient temperatures of -55° to 125° F when supported by four military 5-Ton environmental control units (Provide U.S. government lab test with quote demonstrating similar shelter performance maintaining 40° to 80°F with ambient temperatures of -55° to 125°F)
  • Four (4) air socks with spot cooling
  • 8 oz/sq yd Mil-Spec liner fabric
  • Liner is flame resistant per test method ASTM D6413
    • After flame – 2 seconds max
    • Char length – 6” max
Electrical
  • Single phase electrical panel
    • Two (2) GFCI 20A breakers
    • Two (2) 20A breakers
    • One (1) light switch with breaker
    • Four (4) twist lock cable connectors
  • Two (2) outlet lines with a total of  twenty-four (24) quick connect 110V outlets
  • Ten (10) quick connect LED lights with protective cages
  • 20 ft. 20A power cable included
Anchoring
  • Thirty-two (32) Double headed 18” base frame spikes
  • Twelve (12) Guy ropes and guy spikes
  • Thirty-two (32) Concrete anchors
  • Eight (8) earth anchors with quick link
Spares / Repairs
  • 30 day spares/repair
  • Patch materials for cover, liner, and floor which are all air transportable without special hazmat requirement
Tools & Equipment
  • Verified manual
  • Sledge hammer
  • Spike puller
  • Six (6) pull over ropes
  • Folding extension ladder
  • Hook tool
  • 3/4” box end wrench
  • Cover carry panel
Life Expectancy / Warranty
  • Shelter has a usable life of 10 years and a 20 year storage life
  • Parts may be ordered through GSA or DLA under cage code: 1M7W1
  • Parts have been assigned National Stock Numbers to simplify ordering
  • Shelter includes a standard manufacturer’s warranty
Packaging
  • Wood crate
  • Forklift ready and export approved
  • 88” W x 100” L x 58” H
  • 1170 lbs (crate only)
  • 4350 lbs (total weight with shelter)
Testing & Engineering
  • Tested from -50° to 125° F to maintain inside temperatures of 40° to 80° F with standard military 5-ton ECUs. High heat test conducted with full simulated Saudi Arabia solar load. (Source Selection Testing – McKinley Climatic Laboratories)
  • Wind load capability testing (Source Selection Testing – Aberdeen Proving Ground)
  • Snow load capability of 20 psf (Source Selection Review)
  • Meets naked eye blackout test (Source Selection Testing)
  • 20 setup/strikes and still mission capable (AFOTEC Testing)
  • Assembles in under two hours with trained crew of six (AFOTEC Testing)
  • Tested and passed rain test 40 mph wind with rate of 5 inches per hour (Source Selection Testing – Aberdeen Proving Ground)
  • Tested to accommodate entry/exit of P-19 fire vehicle (AFOTEC Testing)
  • Tested to assemble in MOPP-2 and cold weather gear (AFOTEC Testing)

*Design loads assume that actual soil conditions will meet one of the following in accordance with ASTM D-2487/2488:

  1. Sand gravel / very dense sand
  2. Hardpan / Asphalt

*Fabric weights are nominal

*Dimensions are nominal

Email This Product

×

Customize the CAMSS 30CP

We'll Send this product's picture, description, and details along with your message.

  • Email multiple recipients by separating email addresses with a comma.
  • Info for the CAMSS 30CP

    View online
    • Connect a variety of other shelters to this command post
    • 29'6" Width x 32'6" Length


    The CAMSS 30CP is ideal as a command post for your operations. Several other shelters can be connected to the CAMSS 30CP by its many boot connectors. The 30CP is a variant of  California Medium Shelter System (CAMSS30) which is the Official Medium Shelter System of the United States Air Force, and is widely depended on to support troops around the world. Because of the CAMSS30's extensive testing and real world usage you can be sure that the CAMSS 30CP will be able to handle any environment or situation.




    View and download full product specifications online.



Email

×

Customize the CAMSS 30CP

We 'll send a picture, description, and custom specifications along with your message.

  • Email multiple recipients by separating email addresses with a comma.
  • Info for the CAMSS 30CP

    View this shelter online
    • Connect a variety of other shelters to this command post
    • 29'6" Width x 32'6" Length
    The CAMSS 30CP is ideal as a command post for your operations. Several other shelters can be connected to the CAMSS 30CP by its many boot connectors. The 30CP is a variant of  California Medium Shelter System (CAMSS30) which is the Official Medium Shelter System of the United States Air Force, and is widely depended on to support troops around the world. Because of the CAMSS30's extensive testing and real world usage you can be sure that the CAMSS 30CP will be able to handle any environment or situation.
    General Info
    • Measures 29’6” wide x 32’6″ long x 14’9” tall
    • Usable area of 958 square feet
    • 3180 lbs unpackaged
    • Assembles in under 2 hours with a trained six-person crew
    • Used for command posts, TOC, and forward operating bases
    Cover / Ends
    • 15 oz/sq yd Mil-Spec 44103D fabric 
    • Includes two (2) sets of two (2) 18” ECU ports with a cable port
    • Eight (8) mesh windows with wind resistant blackout covers
    • Guy ropes for high winds
    • Can connect multiple shelters using connector boots or end to end with integrated connector flap
    • Built-in infrared (IR) blocking
    • Fabric includes UV inhibitors and is mold and rot resistant.
    • Fire resistant fabric meets NFPA 701
    • Cover and ends are radio frequency welded
    • Each end panel includes mesh attic vent with cover
    • Top liner included
    Personnel Entries
    • Eight (8) double zipper entries (36” W x 84” H)
      • Tie offs to hold door open
      • Boot Connectors to attach other shelters or vestibules
    Frame
    • Made from lightweight, high-strength aluminum
    • Frame components are interchangeable and color coded to speed assembly
    • Base frame pre-drilled for easy anchoring
    • Base frame includes connection points to secure cover to frame
    • Base Frame is powder coated and corrosion resistant
    • End base includes patented pulley tensioning system to tighten cover
    Fabric Floor
    • Includes a Mil-Spec 44103D floor system that is secured to base frame
    • Continuous hook and loop perimeter for vector proofing
    Liner
    • Shelter includes an internal liner system that helps to maintain internal working conditions of 60° – 80° F in ambient temperatures of -55° to 125° F when supported by four military 5-Ton environmental control units (Provide U.S. government lab test with quote demonstrating similar shelter performance maintaining 40° to 80°F with ambient temperatures of -55° to 125°F)
    • Four (4) air socks with spot cooling
    • 8 oz/sq yd Mil-Spec liner fabric
    • Liner is flame resistant per test method ASTM D6413
      • After flame – 2 seconds max
      • Char length – 6” max
    Electrical
    • Single phase electrical panel
      • Two (2) GFCI 20A breakers
      • Two (2) 20A breakers
      • One (1) light switch with breaker
      • Four (4) twist lock cable connectors
    • Two (2) outlet lines with a total of  twenty-four (24) quick connect 110V outlets
    • Ten (10) quick connect LED lights with protective cages
    • 20 ft. 20A power cable included
    Anchoring
    • Thirty-two (32) Double headed 18” base frame spikes
    • Twelve (12) Guy ropes and guy spikes
    • Thirty-two (32) Concrete anchors
    • Eight (8) earth anchors with quick link
    Spares / Repairs
    • 30 day spares/repair
    • Patch materials for cover, liner, and floor which are all air transportable without special hazmat requirement
    Tools & Equipment
    • Verified manual
    • Sledge hammer
    • Spike puller
    • Six (6) pull over ropes
    • Folding extension ladder
    • Hook tool
    • 3/4” box end wrench
    • Cover carry panel
    Life Expectancy / Warranty
    • Shelter has a usable life of 10 years and a 20 year storage life
    • Parts may be ordered through GSA or DLA under cage code: 1M7W1
    • Parts have been assigned National Stock Numbers to simplify ordering
    • Shelter includes a standard manufacturer’s warranty
    Packaging
    • Wood crate
    • Forklift ready and export approved
    • 88” W x 100” L x 58” H
    • 1170 lbs (crate only)
    • 4350 lbs (total weight with shelter)
    Testing & Engineering
    • Tested from -50° to 125° F to maintain inside temperatures of 40° to 80° F with standard military 5-ton ECUs. High heat test conducted with full simulated Saudi Arabia solar load. (Source Selection Testing – McKinley Climatic Laboratories)
    • Wind load capability testing (Source Selection Testing – Aberdeen Proving Ground)
    • Snow load capability of 20 psf (Source Selection Review)
    • Meets naked eye blackout test (Source Selection Testing)
    • 20 setup/strikes and still mission capable (AFOTEC Testing)
    • Assembles in under two hours with trained crew of six (AFOTEC Testing)
    • Tested and passed rain test 40 mph wind with rate of 5 inches per hour (Source Selection Testing – Aberdeen Proving Ground)
    • Tested to accommodate entry/exit of P-19 fire vehicle (AFOTEC Testing)
    • Tested to assemble in MOPP-2 and cold weather gear (AFOTEC Testing)

    *Design loads assume that actual soil conditions will meet one of the following in accordance with ASTM D-2487/2488:

    1. Sand gravel / very dense sand
    2. Hardpan / Asphalt

    *Fabric weights are nominal

    *Dimensions are nominal

Request Quote

×

Contact Info